How do you structure payments and contracts?
At Bespoke Development Group, financial clarity isn’t just a feature — it’s a standard.
We structure every project using a phased payment system, often referred to as a draw schedule. This breaks your project into logical milestones (e.g., demolition complete, framing finished, MEP rough-ins, drywall and finishes, final punch list). You only pay when that phase is completed and approved — not before.
We require an initial deposit (usually 10–20%) to secure your project on our build schedule and begin procurement, permitting, and planning. From there, draws are issued based on completion checkpoints — not vague timelines. You’ll never be hit with a surprise invoice because we believe billing should reflect tangible progress, not guesswork.
Change orders, when needed, are always submitted in writing with detailed pricing and scope impact — no surprises, no confusion. We help you avoid them by planning obsessively up front. But when you do want to pivot, we make sure the financial side remains predictable and transparent.
Pain Point We Solve: Many contractors blur the line between scope and extras — creating financial tension mid-project. At Bespoke, we draw that line clearly, from day one.
What’s the difference between fixed-price and cost-plus contracts?
We offer both models — and help our clients choose based on the project’s complexity, design status, and risk appetite.
A fixed-price contract gives you one locked-in cost for the entire project. It works best when:
The design is complete
Scope is well-defined
You want predictability over flexibilityThis model offers peace of mind, but if scope changes arise mid-project, they are handled through formal change orders.
A cost-plus contract bills you for actual labor, materials, and subcontractors — plus a fixed builder’s fee (percentage or flat). It’s ideal when:
Design is still evolving
Scope is large or custom
You want more control over selections or value engineering decisionsYou receive full transparency, including copies of receipts and subcontractor invoices. We still offer real-time budgets and change tracking so you can manage costs proactively.
Pain Point We Solve: Some builders abuse the cost-plus model to pad invoices or keep clients in the dark. We eliminate that risk with detailed reporting, open books, and a shared budget dashboard.
⚠️ Why This Matters:
Most construction disputes start with money misunderstandings — poor communication, unclear change orders, and contractors requesting payment without delivering results.
At Bespoke, we’ve built our reputation by doing it differently:
Transparent contracts
Fair draw schedules
Predictable change order policies
Professional billing and real-time budget oversight
We don’t just build homes. We build trust, starting with how we handle your money.